top of page

28 Chevy part 3

Part 3 of the chevy 4 cylinder job starts with the remetal job on the main bearings. Norm pours these and then line bores the block for final size.

The block is then decked and washed up for assembly.

Norm starts putting the bottom end together after Darrian balances the rotating assemblies.


Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page